25 simple steps to building your own home...

  

As found in
"THE OWNER BUILDER GUIDE"

Weather you do these steps yourself or get us to help every step of the way,
you'll find that building your own home is a very easy process... 

Step 1                         

Home Design
Wether you select an already existing ASK HOMES plan or decide to design a home from scratch, your plans need to fit your block and your budget which means getting contour surveys, engineering reports and a quote.
Step 2   
Finance
Once you know what it is you wish to build, you’ll need to work out how you are going to finance it. There are a number of options of how you can do this. We’ll help you decide what’s best for you.
Step 3    
Owner Builders Course & Registration
You’ll need to get your owner builders licence and register with the Builder’s Registration Board.
Step 4   
Council Approvals
You will supply a list of material to council for approval of a Building Permit. You might make some small changes to comply with council requirements during this stage.
Step 5 
Construction Program
Working with your ASK HOMES representitive, you will design a construction program with a list of trades and suppliers in the order of when you will require their services.
Step 6   
Site Preparation
You need to make sure you meet all requirements such as signage, storage, access for work vehicles, vegetation removal etc...
Step 7   
Profiling
This is where your site is marked out exactly where your new building structure will go using string lines and pegs.  
Step 8   
Slab or Floor System Preparation
Depending on what type of house and land you have to build on will depend on what slab or floor system you will require. Each has its own preparation requirements outlined. 
Step 9 
Council Inspection
After preparation you are required to confirm that your efforts so far meet council regulation. You will also need to check to your own satisfaction that issues such as drainage and termite protection have been given proper attention.
Step 10 
Concreting of Slab or Floor System
Call the boys in the big trucks because it’s time to make progress! Getting your foundations in place is a great feeling of accomplishment in the beginning stages of the building process.
Step 11
Wall Frames
Just like building a big Lego toy; you just mark out where the walls go on the slab or floor system and put them all together.
Step 12
Roof Trusses
There are many different roof types and the process differs depending which your home adopts.
Step 13
Roofing
Fibreglass insulation blankets will be laid over the roof battens and your roof covering will go on. You’ll also confirm that the roof is waterproof by fixing flashings and ridging.
Step 14
Eaves and Gables
Depending on if you’re using Hardiplank cladding or Brick Veneer on your home depends on the procedure you’ll adopt to frame up eaves and gables.
Step 15
Services Contractors
You’ll call your plumber, electrician, TV and telecom pre-wire contractors to run pipe and cabling in your frames.
Step 16 
Doors and Fittings
Doors, windows and other fittings are installed such as roller door reveals, sisalation foil to exterior wall and gable ends.
Step 17 
External Cladding 
Fix Hardiplank/Weatherboard or Lay Bricks to exterior of the structure and fix veranda ceiling sheets where required.
Step 18 
Internal Linings
Gyprock linings to cover walls and ceilings are fitted, plumber is employed to connect bath and shower trays and all joints are set and cornices installed.
Step 19
Mouldings
Window and sliding door architraves, internal doors, skirtings, timber supports in cupboards and shelving is installed.
Step 20
PC Items
Kitchens, sink tops, vanity units and laundry tubs and any other cabinets are installed.
Step 21
Tiling
Floor tiles, wall tiles and splashbacks are laid as required. 
Step 22
Plumbing
Plumbing contractor will finish plumbing and wastes. Check and complete all roof flashings and complete drainage including septic where required.

Step 23
Painting
Complete painting of external and internal walls of your home. 

Step 24
Electrical
Electrical subcontractor completes lights, switches, plugs, stove, range hood, hot water system and external lights.
Step 25
Final Inspections
Call for your final inspection! And clean up and lay down carpet, vinyl, paths and drive ways, landscaping, turf and fences... and maybe even a pool?


NOW it’s time to be congratulated!
Because you’ve just built your own
ASK HOME!
 